i have created a test package with 8 steps and i've assigned a test sequence to these steps from 1 to 8.
step with sequence 1 is ready to test but i can start testing from sequence 2 or 3.....
i want to know what else i should do that system not allow user to start testing from sequences higher that 1 while sequence 1 is not ended?