Hi Guys
After renaming a test Solution Manager, which is a copy from an existing System, Change Management Tab is not visible in the a Project Attributes.
Before the SID renaming, the tab was visible, but after chaning the name to SMT, it no longer appear.
When accessing SOLAR_PROJECT_ADMIN transaction, under System Landscape, there are only three tabs instead of four
Some logical relation is missing? Any idea where can I verify why?
Thanks!
Copied and Renamed system (SMT) with SOLMAN_ADMIN, client 200
Original System (SSM), user SOLMAN_ADMIN on Client 200