Hi Folks,
I got some problems with a 4 system landscape in ChaRM.
The error message I get when doing a consistency check within my SMI project is:
Message from function module /TMWFLOW/CHECK_PRJ_CONS: No export system for NWA-303
Message no. /TMWFLOW/TRACK_N159
Transport route should be as follows:
DEV -> QAS -> INT -> PRD
Since I am still in testing phase I used clients instead of real systems in my configuration (TMS, Logical component,....)
My configuration looks like this:
NWA client 300 -> 301, transport layer ZCHM, transport layer SAP, consolidation
NWA client 301 -> 302, delivery
NWA client 302 -> 303, delivery
Logical Component defined as follows:
Developement System (Source: SAP): NWA:300
Type of Role: D Source System
Quality Assurance System (Source: SAP): NWA:301
Type of Role: O Target System
Integration System (Source: User): NWA:302
Type of Role: O Target System
Production System (Source: SAP): NWA:303
Type of Role: P Production System
Anyone got an idea what is wrong? did I miss anything?
The same configuration works for a 3-tier Landscape (without Integration System).
Any help is appreciated.
Thanks.