Adding SAP delivered test cases into Template Project
Big question, In other customers I was able to find a large array of pre-delivered automated test cases that I could use. Create cost centre, create planning, etc. Now I am doing the same for a...
View ArticleCHARM and Single Sign On
Dear SAP gurus - We have a requirement for configuring SSO on CHARM - Solution manager 7.1When a user logs in to windows workstation and opens the link for CHARM to create a request or opens a link...
View ArticleError in SUM tool while upgrading Solution manager
Hi Experts, While doing SP level upgrading using SUM tool in Solaman, we are facing issue like below, ERROR: Your source system is secured by the SAPCryptolib. We have downloaded and copy...
View ArticleSAP Solution Manager ITSM
Hi, We have implemented ITSM in Solution manager 7.1 SP 7, Configured email when the status of the incident is changed. It's working fine.We have created PFAC rule to choose the support team...
View Articlecannot create transport request for urgent correction
Hi, Currently upgraded our SAP Solution Manager 7.1 instances to SP 12. After the creating of the urgent correction and changing the status to In Development, it is not possible to create a transport...
View ArticleSevere error(s) occurred in phase PREP_INSTALL/SHDINST_OS while upgrading solman
Hi Expert, While upgrading the solman using SUM tool i am facing issue like beow(attached), Severe error(s) occurred in phase PREP_INSTALL/SHDINST_OS! Last error code set: Shadow instance could not be...
View ArticleManaged System Configuration: Error
Hi Friends, I am doing Managed System Configuration for a JAVA system.In the step Enter parameters, I am facing error : Logon test failed for user Administrator Details : No configuration found for...
View ArticleCRM_SOCM_SERVICE_REPORT error
Dear experts, I am using the report CRM_SOCM_SERVICE_REPORT to move the Change Requests to production system. But i always get an error "Document 1000005677 refused for technical reasons:...
View ArticleSAINT Error in phase XPRA_EXECUTION
I installed Solution Manager 7.1 on MSSQL 2012. I started system update up to SPS 12. I used TC SAINT to install Enhancement Packages from downloaded disk and used XML file from this disk. I got this...
View ArticleHow to set "Do not disturb" hours for Technical Monitoring alerts ?
Dear Experts, I configured more or less working technical monitoring in Solution Manager 7.1 SPS 12.Our SLA times are from 7 to 18h. Everywhere I had the possibility, I have put thesehours, like in...
View Articleenhance CRM UI search with custom fields
Hi all, I've read lots of threads on SCN dealing with the enhancement of the CRM UI with custom fields.In the meantime I already managed it that in ITSM information from an append structure on...
View ArticleChange mail sender
Hi All, When we create an incident the mail notifications were send by the autor of the incident or by the people who make some changes in the incident. I would like to change the mail sender to a...
View ArticleError ST-A/PI 01Q_700 is not installed for 7.1 SP12 when 01R_700 is installed.
Hello, After upgrading to 7.1 SP12 there is the error "ST-A/PI 01Q_700 is not installed" for the Solution Manger system and the satellite systems in Managed System Configuration > 2 . Check...
View Article" Unable to check The Job Monitoring results in Solution Manager Workcenter"
Hi Experts, Currently we are using SAP Solution Manager 7.1 Sp12, I have Configured Job Monitoring Scenario in SAP Solution Manager 7.1 SP12. Under Technical Monitoring --> Job and BI Monitoring ( I...
View ArticleChaRM Configuration
Hi All, I am currently setting up charm and would like to know how to enable "Project Planning" in "Details" Assignment block of a change request transaction. See screen shot below Thank You
View ArticleHow to add 3rd party non-SAP system to a ChaRM project?
Hi everyone, how can I add a 3rd party non-SAP system to a Solution Manager SOLAR project for use with ChaRM General Changes? The situation so far: We are already using ChaRM for our SAP landscape...
View ArticleEmail Not Triggering in Second Time
Dear Exports, " Release to Approve" is the Customized Action and Related Mail Action also Created, First Time " Release to Approve" Action and Related Mail Action is Working, But Second time if i...
View Articlefew of the metrics gray in technical monitoring
Hi All, We have configured the managed system setup and technical monitoring for our Production system Few of the metric are shown in gray status ,when i check for data collection it gives below log...
View ArticleE-Mail functionality not working for urgent correction in SAP Solution...
Hi All, I have define action profiles & Condition for Requester & Change manager in Zmcr both are working fine.but our client needs an email notification on action "Successfully tested" i have...
View ArticleMOPZ Configuration Solman 7.1 SPS12
Hello All, I am trying to configure MOPZ in Solman7.1 with SPS12, i have finished System Preparation and Basic Configuration, but i am not able to see where can i configure MOPZ. any body have any...
View Article