Hi,
I have done managed system configuration for ABAP as well as JAVA system. But now we have a BIA system P11 connect to a BI system P06 . The requirement is system monitoring of BIA system and it is not yet connected to SLD also. Can someone guide me how to start and proceed step by step.
Thanks
Neha Singh